Bougrain, F (2012) Energy performance and public private partnership. Built Environment Project and Asset Management, 2(01), 41-55.

  • Type: Journal Article
  • Keywords: construction works; energy management; energy saving performance contract; France; innovation; life cycle costing; partnership; private sector; public administration; public-private partnership; service quality
  • ISBN/ISSN: 2044-124X
  • URL: https://doi.org/10.1108/20441241211235044
  • Abstract:
    Purpose – The purpose of this paper is to investigate the performance of public-private partnership (PPP) and the ability of private consortia and public authorities to together develop solutions that reduce building energy consumptions. Design/methodology/approach – The paper reviews the performance of PPP projects based on criteria such as respect for timely delivery and costs, innovation, service quality and life cycle costing; then a case study focusing on energy saving performance contract (ESPC) is expounded. Findings – The research indicates that PPP performs well on issues such as respect of timetable and contracted prices but does not establish that PPP promotes innovation, quality of service delivery and life cycle costing. It also appears that energy issues are gradually integrated in contracts in progress under the influence of thermal regulations. Among PPP projects, ESPC focuses on energy savings measures. Their success mainly requires that public authorities have a good knowledge of the status, occupation level and energy consumptions of their buildings. Information disclosure in the contract also reduces uncertainty and creates trust among partners. Practical implications – The research should raise the awareness of public authorities on imperatives to have a good knowledge of the status, occupation level and energy consumptions of their buildings. Originality/value – Most PPPs have been evaluated at the design and construction stages. Evaluations of PPPs in operation are less frequent. Examining the first ESPC in operation in France is an original contribution that opens doors for further empirical investigations in this field.

Guyer, R C and Laman, J A (2012) Short-line railroad management system for bridge prioritization. Built Environment Project and Asset Management, 2(01), 25-40.

Hoezen, M, Voordijk, H and Dewulf, G (2012) Contracting dynamics in the competitive dialogue procedure. Built Environment Project and Asset Management, 2(01), 6-24.

Loosemore, M and Chandra, V (2012) Learning through briefing: for strategic facilities management in the health sector. Built Environment Project and Asset Management, 2(01), 103-17.

Marco, A D, Mangano, G and Zou, X-Y (2012) Factors influencing the equity share of build-operate-transfer projects. Built Environment Project and Asset Management, 2(01), 70-85.

Nzekwe-Excel, C (2012) Satisfaction assessment in construction projects: a conceptual framework. Built Environment Project and Asset Management, 2(01), 86-102.

Ren, Z, Kwaw, P and Yang, F (2012) Ghana's public procurement reform and the continuous use of the traditional procurement system: The way forward. Built Environment Project and Asset Management, 2(01), 56-69.